2006 Corrective Action Permit
Approval & Table of Contents
Section I -- General Permit Conditions
Section II -- General Facility Conditions
Section III -- Special Conditions Pursuant to the 1984 HSWA
Section IV -- Corrective Measures and Groundwater Monitoring
Attachment 1 -- Waste Analysis Plan
Attachment 2 -- Inspection Schedule
Attachment 3 -- Personnel Training
Attachment 4 -- Contingency Plan
Attachment 5 -- Closure Plan
Attachment 6 -- Closure and Post-Closure Cost
Attachment 7 -- Groundwater Monitoring Well Locations
Attachment 8 -- Groundwater Monitoring Well Specifications
Attachment 9 -- Sampling and Analysis Plan for Groundwater Monitoring
03-28-2013 Class 1 Modification - Updated Cost Estimates
10-28-2014 Class 1 Modification - In-Situ Biological Reactor (ISBR) Augmentation System
6-24-23 Class 1 Modification - Emergencyy Contact Change