2014 Post-Closure/Corrective Action Permit
Approval & Table of Contents
Section I - General Permit Conditions
Section II - General Facility Conditions
Section III - Groundwater Monitoring
Section IV - Post-Closure Care and Maintenance
Section V - Corrective Action and Special Conditions Pursuant to the 1984 HSWA
List of Figures
Figure 1 - Areas of Concern Designations with Historic SWMU Grouping Areas
Figure 2 - Historical Site Features Showing SWMU Locations
Figure 3 - Flow Chart of Continued Perimeter Control Chronology
Figure 4 - Gantt Chart of Continued Perimeter Control Chronology
Attachment 1 - Areas of Interest
Attachment 2 - Description of Areas of Interest
Attachment 3 - Security, Inspections, Personnel Training
Attachment 4 - Sampling and Analysis Plan
Attachment 5 - Protection of Groundwater
Attachment 6 - Post-Closure Plan for the LTU
Attachment 7 - Post-Closure Costs
Attachment 8 - Corrective Action Management Plan
Attachment 9 - Groundwater Monitoring Standard Operating Procedures
Attachment 10 - Materials and Waste Management Plan
Attachment 11 - 2013 Groundwater Monitoring Plan
Attachment 12 - RCRA Part A Permit Application
01-23-2015 Class 1 Modification - Approval
01-23-2015 Class 1 Modification - Attachment 4
01-23-2015 Class 1 Modification - Attachment 5
01-23-2015 Class 1 Modification - Attachment 6
01-23-2015 Class 1 Modification - Attachment 7
01-23-2015 Class 1 Modification - Attachment 8
10-23-2017 Class 1 Modification - Addition of Arsenic
01-23-2015 Class 1 Modification - Attachment 11
02-02-2023 Class 2 Modification - Addition of Monitoring Well MW-751