2018 Post-Closure Permit
Approval & Table of Contents
Part I - Standard Permit Conditions
Part II - General Facility Conditions
Part III - Post-Closure Care
Part IV - Groundwater Monitoring: Detection Monitoring
Part V - Corrective Action
Part VI - Landfill Operations Conditions
Attachment 1 - Facility Map
Attachment 2 - Security Plan
Attachment 3 - General Inspection Requirements
Attachment 4 - Personnel Training
Attachment 5 - Post-Closure Plan
Attachment 6 - Post-Closure Cost Estimates
05-16-2019 Class 2 Modification - Approval
05-16-2019 Class 2 Modification - Part IV - Groundwater Monitoring: Detection Monitoring
05-16-2019 Class 2 Modification - Part V - Corrective Action
02-22-2024 Class 2 Modification - Approval, Part IV - Groundwater Monitoring: Detection Monitoring, Part V - Corrective Action
2011 Operations Permit
Approval & Table of Contents
Part I - Standard Permit Conditions
Part II - General Facility Conditions
Part III - Storage in Containers
Part IV - Storage and Treatment in Tanks
Part V - Groundwater Detection Monitoring
Part VI - Landfill Operations Conditions
Part VII - Special Conditions Pursuant to the 1984 HSWA
Attachment 1 - Waste Analysis Plan
Attachment 2 - Security Plan
Attachment 3 - Contingency Plan
Attachment 4 - Preparedness and Prevention Procedures
Attachment 5 - Closure Plan
Attachment 6 - Closure/Post-Closure Cost Estimate
Attachment 7 - Groundwater Sampling and Field Analysis Operating Procedures
Attachment 8 - Use of Leachate as Suppressant
Attachment 9 - Inspection Program
Attachment 10 - Manifest System, Recordkeeping and Reporting
Attachment 11 - Waste Management Areas Permitted Volumes
09-02-2011 Class 3 Modification - Approval
09-02-2011 Class 3 Modification - Part II - General Facility Conditions
09-02-2011 Class 3 Modification - Part VI - Landfill Operations Conditions
09-02-2011 Class 3 Modification - Landfill Cell 15 Location and Engineering Drawings
09-02-2011 Class 3 Modification - Cell 15 Closure Plan
09-02-2011 Class 3 Modification - Use of Leachate as Suppressant
09-02-2011 Class 3 Modification - Groundwater Sampling and Field Analysis Operating Procedures
03-14-2012 Class 1 Modification - Contingency Plan
05-30-2012 Class 1 Modification - Cell 15 CQA Plan
06-08-2012 Class 1 Modification - New Gate Installation
08-03-2012 Class 1 Modification - Temporary Height Increase for Waste Mounding
05-07-2013 Class 1 Modification - Cell 15, Subcells 9, 10, & 11 Leachate Collection System Revision
06-11-2013 Class 1 Modification - Address Change
01-08-2014 Class 2 Modification - Modification to Perimeter Grades, Cell 15, Subcells 12 & 13
12-05-2014 Class 1 Modification - Contingency Plan Update
02-25-2015 Class 3 Modification - Cell 15 Expansion
03-08-2016 Class 1 Modification - Contingency Plan Update
05-14-2018 Class 1 Modification - Contingency Plan Update
05-16-2019 Class 2 Modification - Approval
05-16-2019 Class 2 Modification - Part V - Groundwater Detection Monitoring
05-16-2019 Class 2 Modificaiton - Groundwater Sampling and Field Analyses Standard Operating Procedures
11-14-2019 Class 1 Modification - Contingency Plan Update
06-06-2022 Class 1 Modification - Contingency Plan Emergency Coordinator
08-02-2022 Class 2 Modification - Base Grading Plan for Landfill Cell 15
01-30-2024 Class 3 Modification - Permit Boundary Expansion
02-22-2024 Class 2 Modification - Approval, Part V Groundwater Detection Monitoring, SOP Table 4 & Table 7
05-15-2025 Class 2 Modification - Revised Base Grading Plan for Landfill Cell 15
10-09-2025 Class 1 Modification - Temporary Waste Mounding Height, Landfill Cell 15