2018 Post-Closure Permit
Approval & Table of Contents
Part I -- Standard Permit Conditions
Part II -- General Facility Conditions
Part III -- Post-Closure Care
Part IV -- Groundwater Monitoring: Detection Monitoring
Part V -- Corrective Action
Part VI -- Landfill Operations Conditions
Attachment 1 - Facility Map
Attachment 2 - Security Plan
Attachment 3 - General Inspection Requirements
Attachment 4 - Personnel Training
Attachment 5 - Post-Closure Plan
Attachment 6 - Post-Closure Cost Estimates
05-16-2019 Class 2 Modification - Approval
05-16-2019 Class 2 Modification - Part IV - Groundwater Monitoring: Detection Monitoring For Releases
05-16-2019 Class 2 Modification - Part V - Corrective Action
02-22-2024 Class 2 Modification - Approval, Part IV Groundwater Monitoring, Part V Corrective Action
2011 Operations Permit
Approval & Table of Contents
Part I -- Standard Permit Conditions
Part II -- General Facility Conditions
Part III -- Storage in Containers
Part IV -- Storage and Treatment in Tanks
Part V -- Groundwater Detection Monitoring
Part VI -- Landfill Operations Conditions
Part VII -- Special Conditions Pursuant to the 1984 HSWA
Attachment 1 -- Waste Analysis Plan
Attachment 2 -- Security Plan
Attachment 3 -- Contingency Plan
Attachment 4 -- Preparedness and Prevention Procedures
Attachment 5 -- Closure Plan
Attachment 6 -- Closure/Post-Closure Cost Estimate
Attachment 7 -- Groundwater Sampling and Field Analysis Operating Procedures
Attachment 8 -- Use of Leachate as Suppressant
Attachment 9 -- Inspection Program
Attachment 10 -- Manifest System, Recordkeeping and Reporting
Attachment 11 -- Waste Management Areas Permitted Volumes
02-15-2011 Class 1 Modification -- Time Extension for Temporary Increase in Allowed Waste Mounding Height
05-20-2011 Class 1 Modification -- Temporary Increase in the Allowed Waste Mounding Height
09-02-2011 Class 1 Modification -- Contingency Plan Updates
09-02-2011 Class 3 Modification -- Approval
09-02-2011 Class 3 Modification -- Part II -- General Facility Conditions
09-02-2011 Class 3 Modification -- Part VI -- Landfill Operations Conditions
09-02-2011 Class 3 Modification -- Landfill Cell 15 Location and Engineering Drawings
09-02-2011 Class 3 Modification -- Cell 15 Closure Plan
09-02-2011 Class 3 Modification -- Closure Cost Estimate
09-02-2011 Class 3 Modification -- Post-Closure Cost Estimate
09-02-2011 Class 3 Modification -- Use of Leachate as Suppressant
09-02-2011 Class 3 Modification -- Groundwater Sampling and Field Analysis Operating Procedures
09-02-2011 Class 3 Modification -- Attachment A -- CHLM Response to USEPA Region 6 Comments
11-22-2011 Class 1 Modification -- Temporary Mounding Height
03-14-2012 Class 1 Modification -- Contingency Plan
05-30-2012 Class 1 Modification--Cell 15 CQA Plan
06-08-2012 Class 1 Modification -- New Gate Installation
06-14-2012 Class 1 Modification -- Temp Divider Berm, Cell 15, Subcells 7/8
08-03-2012 Class 1 Modification -- Temporary Height Increase
09-12-2012 Cell 15, Subcell 8 Engineering Drawings
03-13-2013 Class 1 Modification - Contingency Plan Update
03-28-2013 Class 1 Modification - Updated Cost Estimates
04-18-2013 Cell 15, Subcells 9, 10, & 11 Construction Drawings
05-07-2013 Class 1 Modification - Cell 15, Subcells 9, 10, & 11 Leachate Collection System Revision
06-11-2013 Class 1 Modification - Address Change
01-08-2014 Class 2 Modification - Modification to Perimeter Grades, Cell 15, Subcells 12 & 13
12-05-2014 Class 1 Modification - Contingency Plan Update
02-25-2015 Class 3 Modification - Cell 15 Expansion
03-08-2016 Class 1 Modification - Contingency Plan Update
05-14-2018 Class 1 Modification - Contingency Plan Update
05-16-2019 Class 2 Modification - Approval
05-16-2019 Class 2 Modification - Part V - Groundwater Detection Monitoring
05-16-2019 Class 2 Modificaiton - Groundwater Sampling and Field Analyses Standard Operating Procedures
11-14-2019 Class 1 Modification - Contingency Plan Update
06-06-2022 Class 1 Modification - Contingency Plan Emergency Coordinator
08-02-2022 Class 2 Modification - Base Grading Plan for Landfill Cell 15
01-30-2024 Class 3 Modification - Permit Boundary Expansion
02-22-2024 Class 2 Modification - Approval, Part V Groundwater Detection Monitoring, SOP Table 4 & Table 7