2021 Development and Operations Plan
Approval and Conditions
Development and Operations Plan
Appendix 1- DEQ Approval Letter 2001
Appendix 2- DEQ Review Checklists
Appendix 3- Warrenty Deed
Appendix 4- EMI Maps
Appendix 5- Facility Design Drawings
Appendix 6- Facility Equipment List
Appendix 7- EPA Waste Bulking Memo
Appendix 8- Waste Process Flow Charts
Appendix 9- Used Oil Analysis Plan
Appendix 10- Waste Management Operations Forms
Appendix 11- EMI Terminal Inspection Checklist
Appendix 12- Storm water Pollution Prevention Plan
Appendix 13- Facility Security Plan
Appendix 14 Spill Prevention Control and Countermeasure Plan
Appendix 15- Emergency Action Plan- Site Contingency Plan
Appendix 16- No Adverse Impact Determination Letters
Appendix 17- Insurance Liability Certificate
Appendix 18- Waste Exclusion Plan
Appendix 19- Health and Safety Plan
Appendix 20- Product Distribution Program
Appenix 21- EMI EPA DEQ Notification Forms
Appendix 22-Closure Cost Estimate and Financial Assurance