2018 Development and Operational Plan
Approval and Conditions
Development and Operational Plan
Appendix 1 Site Plans and Drawings
Appendix 2 Waste Receipt, Labeling and Tracking
Appendix 3 Tank Capacity, Composition and Location
Appendix 4 Drum Crusher Unit Specifications
Appendix 5 EPA Correspondence on Waste Consolidation
Appendix 6 Waste Analysis Plan
Appendix 7 EPA Correspondence on Transfer Station Regulations
Appendix 8 Health and Safety Plan
Appendix 9 Contingency Plan
Appendix 10 Training Program
Appendix 11 Inspection Plan and Checklists
Appendix 12 Site Security Plan
Appendix 13 Recycling Plan
Appendix 14 Closure Plan
Appendix 15 Financial Assurance Demonstration
Appendix 16 RCRA Site Identification Form
Appendix 17 Site Legal Description